Infrastructure

Infrastructure

We have factory setup as per best prevailing industry practices to support our quality commitment. Proper size (small to big) winding machines, insulation processing machinery, winding pressing machines, assembly tools, stage inspection measuring, testing tools and practices help us in maintaining specifications as per design.

Proper production equipments and practices enable us in maintaining the design standards, as under.

Adequate size winding machines best winding results

Proper handling tools gives perfect finish and dimensions

Process dimension measurement observed

Two over head cranes gives flexibility of operations

Preheating of windings in two air drying ovens

Final heating and moisture removal in vacuum oven

Big vacuum oven to handle assemblies up to 30 MVA,132 KV class transformers

Infrastructure

 

Infrastructure

World class testing set up gives us the confidence of the products manufactured by us are in line with the design or not.

Use of 0.2 class power analyzer for loss measurement

Co ordination between power analyzer with PLC and Industrial PC

Software to select proper ranges of CTs, PTs and electrical parameters for best results

Data logging in system to ensure any operator mistake and future records

Different sizes DVDF set for various capacity of transformers

50 KV and 150 KV H.V. Testers for separate source insulation test

Ratio meter, Resistance meter and Insulation tester of reputed brands with best accuracy